2010
|
|
WQEW |
New York, NY |
|
August 2010
Repair original ground system where builder
used incorrect brazing alloy, install ATU arc gaps and other repair
work. |
|
KILT |
Houston, TX |
|
January & August 2010
MoM Preparation. Install new sample
lines, fences and other grounding |
|
KIKK |
Houston, TX |
|
August 2010
Install fence grounding |
|
WAGG |
Birmingham, AL |
|
May 2010
Repair ground system damage caused by
construction around towers. |
|
WIOZ |
Aberdeen, NC |
|
March 2010
Evaluate vandalism to ground system and feed
system. |
|
KWAM |
Memphis, TN |
|
July 2010
Locate and mark ground system and feed lines
for future site construction. |
|
|
|
|
|
|
|
|
2009
|
|
WRLM |
Irondale, AL |
|
Janurary 2009
Install new ND ground system |
|
KELP |
El Paso, TX |
|
March 2009
Rebuild 3 tower ground system following
construction damage |
|
WQXI |
Atlanta, GA |
|
December 2008
Rebuild 2 tower DA ground system and other
grounding work |
|
WBCO |
Bucyrus, OH |
|
August 2008
Install new sample line via Directional Boring |
|
WABC. |
New York, NY |
|
July 2008
Ground System Evaluation and Repair |
|
KRVN |
Holdredge, NE |
|
July 2007
Ground System Evaluation |
|
WBWL |
Jacksonville, FL |
|
June 2008
Rebuild 5 tower Inline DA |
|
KWAM |
West Memphis, AR |
|
Feburary 2008 and beyond
Refurbish array infrastructure, site
access, array tuneup |
|
XEGH |
Rio Bravo, Mexico |
|
November 2007
Build new ground system |
|
KTIS |
Minneapolis, MN |
|
October 2007
Evaluate and repair ground system |
|
WILC |
Laurel, MD |
|
July 2007
Repair and enhance tower base
grounding |
|
KDWA |
Hastings, MN |
|
July 2007
Build new ground system |
|
WIBC |
Indianapolis IN |
|
July 2007
Repair and enhance tower base
grounding |
|
WNOG |
Naples FL |
|
June 2007
Ground System Evaluation |
|
WYHL |
Meridian
MS |
|
June 2007
Rebuild ND Ground System |
|
KZDC |
San
Antonio TX |
|
March 2007
Build New 4 tower ground system |
|
WCIN |
Cincinnati
OH |
|
June 2007
Repair vandalism damage. |
|
WMBG |
Williamsburg
VA |
|
March 2007
Build New ND ground system |
|
KCRG Cedar
Rapids, IA
October 2006
Rebuild 3 tower ground system and
install new feed and sample lines. |
|
KRLD
Dallas TX
December 2006
Rebuild 2 tower array ground system
and building ground infrastructure. |
|
WPHE
Phoenixville, PA
September 2006
2 tower DA rebuild |
|
KDWA
Hastings, MN
July 2006 ND Build |
|
WCIN
Cincinnati, OH
Feb. 2006 5 twr DA Build |
|
WNDA Deland, FL
Dec. 2005 ND Rebuild |
|
KMOX
St. Louis, Mo
Nov. 2005
ND Rebuild & other work. |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
This Page has had |
|
| |
 |
|
| |
Visitors Since The Site was Rebuilt
September '05 |
|
| |
|
|
|

WYHL
Meridian, MS
July 2007
WYHL is a 1kw ND station serving Meridian. It was locally
owned for many years and then acquired by one of the major radio
corps in a combo deal for the associated FM. Being a minor
player in the local market, it was mostly ignored by various owners
and had fallen into very poor condition. It had recently been
purchased by Urban Radio in a mulit-station deal.
A large fire ant nest had appeared directly in front of the TX
building door. Someone had simply laid a wooden pallet across
it rather than kill it. The nest eventually covered the steps
entering the building and grew to almost the height of the door
threshold. While cleaning out around the building, we
discovered the ant mound and then shortly the concrete steps.
A little cleanup work with the tractor, a bag of fire ant bait and
amazingly the building was accessible again.
Large pine and hardwood trees had been allowed to encroach onto the
ground system. The encroaching vegetation was cleared back by
grinding machine which IS NOT a suitable method for clearing a
ground field if a new GS will be installed. We were able to
plow about a third of the site before getting into the thick stumps
and debris left from the grinding process. At that point, we
had to stop plowing and clean up the mess left by the grinder.
The site was cleaned and a new GS successfully constructed. We
later tuned the tower and submitted an impedance sweep for FCC
submittal.
|
|
|
|
|
|
|
|
|
The site appeared to be very clean when we arrived. Appearances can be deceiving. |
|
|
|
|
|
|
|
|
|
|
|
|
The site had been cleared using a grinding machine. The stumps noted in this and following images were ground down to grade level. The grinder literally devours the tree, brush, etc and leaves all stumps, roots and debris on the ground. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
We pushed up huge piles of the debris left from the grinding process. These debris range in size from toothpicks to 8ft long logs. The debris will collect around the plow and force it up out of the ground. The plow will hang on the roots and stumps. IF we are lucky, we won't break the plow when hitting the underground obstructions. |
|
|
|
|
|
|
|
|
|
|
|
|
One of the piles of debris. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The exposed area of the radials are covered up to the tower base. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The first run of landscape fabric and gravel. |
|
|
|
|
|
|
|
|
|
|
|
|
|
The screen, bridling strap and main tower base grounding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
All fabric and gravel down. |
|
|
|
|
|
|
|
|
|
|
|
|
This tree was allowed to grow up beside one of the guy anchors. |
|
|
|
|
|
|
|
|
|
|
|
|
The tree was approximately 16in across at the ground. Notice the turnbuckles bent around the stump. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The site had numerous piles of junk and debris scattered around. This pile of shingles was at least a truck load. We cleaned up the junk and debris such that the site could be more easily maintained in the future. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Fire Ants had built a mount that completely covered the steps up the to level of the door. Someone had simply laid a wooden pallet across the mound instead of killing it. We dug the mound out, cleaned up the steps and spread fire ant bait. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Still cleaning up wood debris. |
|
|
|
|
|
|
|