2010

WQEW  New York, NY
August 2010

Repair original ground system where builder used incorrect brazing alloy, install ATU arc gaps and other repair work.

KILT  Houston, TX
January & August 2010

MoM Preparation.  Install new sample lines, fences and other grounding

KIKK Houston, TX
August 2010

Install fence grounding

WAGG  Birmingham, AL
May 2010

Repair ground system damage caused by construction around towers.

WIOZ  Aberdeen, NC
March 2010

Evaluate vandalism to ground system and feed system.

KWAM  Memphis, TN
July 2010

Locate and mark ground system and feed lines for future site construction.

 
 
 
 

2009

WRLM  Irondale, AL
Janurary 2009

Install new ND ground system

KELP  El Paso, TX
March 2009

Rebuild 3 tower ground system following construction damage

WQXI  Atlanta, GA
December 2008

Rebuild 2 tower DA ground system and other grounding work

WBCO  Bucyrus, OH
August 2008

Install new sample line via Directional Boring

WABC.  New York, NY
July 2008

Ground System Evaluation and Repair

KRVN  Holdredge, NE
July 2007

Ground System Evaluation

WBWL  Jacksonville, FL
June 2008

Rebuild 5 tower Inline DA

KWAM  West Memphis, AR
Feburary 2008 and beyond

Refurbish array infrastructure, site access, array tuneup

XEGH  Rio Bravo, Mexico
November 2007

Build new ground system

KTIS  Minneapolis, MN
October 2007

Evaluate and repair ground system

WILC  Laurel, MD
July 2007

Repair and enhance tower base grounding

KDWA  Hastings, MN
July 2007

Build new ground system

WIBC  Indianapolis IN
July 2007

Repair and enhance tower base grounding

WNOG  Naples FL
June 2007

Ground System Evaluation

WYHL  Meridian MS
June 2007

Rebuild ND Ground System

KZDC  San Antonio TX
March 2007

Build New 4 tower ground system

WCIN  Cincinnati OH
June 2007

Repair vandalism damage.

WMBG  Williamsburg VA
March 2007

Build New ND ground system

KCRG Cedar Rapids, IA

 

October 2006

Rebuild 3 tower ground system and install new feed and sample lines.

KRLD Dallas TX

December 2006

Rebuild 2 tower array ground system and building ground infrastructure.

WPHE Phoenixville, PA

September 2006

2 tower DA rebuild

KDWA Hastings, MN

July 2006 ND Build

WCIN Cincinnati, OH

Feb.  2006  5 twr DA Build

WNDA Deland, FL

Dec. 2005  ND Rebuild

KMOX St. Louis, Mo

Nov. 2005  ND Rebuild & other work.

 
     
     
     
 

This Page has had

 
 

Hit Counter

 
 

Visitors Since The Site was Rebuilt September '05

 
     

KMOX Ground System Rebuild

and

Coax Repair

November 2005

We signed a contract from Infinity/CBS  to rebuild the old ailing KMOX ground system and repair a burned 3in coax in the ATU building. The old connector was almost completely burned off of the line.  The first request we received was to splice the burned cable outside the building UNDERGROUND.  I was able to convince KMOX consultants and engineers that the underground splice was not a good idea since flange connectors have an official designation of "Weatherproof" not waterproof.  We eventually had to locate the cables and excavate back approximately 20ft from the ATU building, we then routed the old coax and a new section up thru large conduits into a large NEMA enclosure mounted on a concrete pier.   The splice consists of a pair of right angle flange connectors.  Probably wouldn't be ideal for FM but worked great for high power AM.

The ground system was specified to be 240 half wave (490ft) radials.  We had to locate a large portion of the old radials along fence lines and reconnect into the new ground system.  There was also an area where the new ground system would be shortened and connected to the KMOX standby tower.  This was done by locating the old radials, digging a trench along the fence line exposing the old radials and then installing the new radials and a 2in transverse strap (as between towers in a DA).

 

 


Click on a picture to view a larger version.

The backside of the KMOX TX building

KMOX Tower from the driveway behind TX building.

The ground system is complete. The fence and new asphalt is visible.

Across the site

Another shot along the newly paved driveway.

The ground never froze but it got plenty cold enough to freeze casual water.

The gravel along the new asphalt was placed to cover exposed radials that ran across the large rock of the road foundation.

A very nice looking site after all work was complete. The old fence was falling down and the asphalt was pretty ratty.

The NEMA enclosure shown here houses a splice in one of the 3in feed lines to the ATU building. More on the repair later.

Fence grounding as suggested by Jack Sellmeyer and designed by AGSC.

The fence posts had large copper conductors cadwelded to their base and bonded back to the main tower base ground point.

Several 1in copper pipes were installed thru the ATU building for RF grounds. The outside ends were bonded back to the tower base ground point.

The KMOX tower base.

Looking back toward the TX building.

Not exactly KMOX but certainly St. Louis. This is the brick pavement along the Mississippi River below the Arch.

The inside of the tippity top of the Gateway Arch.

Looking down from the top of the Arch.

The new Bush Stadium under construction.

What was left of the old Stadium.

The Capital.

Not a clue...

Looking up at the arch.

AM Ground Systems Co.